How much does a house extension cost in Bedfordshire

If you’re thinking about house extension cost Bedfordshire, cost is usually the first question. The honest answer is that it depends on the size, the specification and the site itself, but here’s a clear guide based on real project ranges, to help you budget before you get a formal quote.

Read more about how we plan and build extensions on our house extensions page.

How Much Does a House Extension Cost Bedfordshire?

Single storey rear house extensions

A standard single storey extension typically costs between £35,000 and £80,000 or more. Larger extensions, extensive glazing and higher end finishes can push this beyond that range.

Double storey house extensions

A typical double-storey extension generally falls between £65,000 and £130,000 or more. As with single-storey builds, the specification makes a big difference, so this is a guide rather than a fixed rate.

Garage conversions, side returns and wraparounds

A straightforward garage conversion usually costs around £15,000 to £30,000 or more, depending on insulation, structural changes, windows, plumbing and how the room will be used.

Side return extensions generally start around £30,000 to £40,000. Larger wraparound extensions can range from approximately £60,000 to £120,000 or more, particularly where structural steelwork and large glazed openings are involved.

What's usually included

A full construction package typically covers site setup, excavation and groundworks, foundations and drainage, structural alterations and steelwork, brick or block construction, roofing, windows and doors (including bi-fold or sliding doors), insulation, first and second fix carpentry, plumbing and heating alterations, electrical installation, plastering, flooring, and internal finishing through to final handover.

 

Quotes can be tailored depending on whether you want a structural shell or a complete, ready-to-use finished space.

What's usually not included

Architect or design fees, planning application fees, Building Control fees and structural engineer fees are normally shown separately or arranged directly by the customer. Kitchen units, appliances, specialist finishes, decorating and customer-selected fixtures are also usually excluded unless specifically requested.

What affects the price

The biggest factors are the overall size and complexity of the build, ground conditions, access, drainage alterations, structural steelwork, roof design, large bi-fold or sliding doors, roof lanterns, the specification of windows and doors, and the level of internal finish. Two extensions of the same floor area can end up costing very different amounts once these factors are taken into account.

Costs people often forget

Planning and professional fees are commonly overlooked. Other easily missed costs include structural calculations, Building Control, drainage alterations, utility upgrades, kitchens, flooring, decorating, landscaping, reinstating patios or driveways after construction, and any unforeseen ground conditions. Identifying these early gives you a realistic picture of the whole project, not just the headline construction cost.

VAT

A proper quotation should always state clearly whether figures are inclusive or exclusive of VAT, so there’s no ambiguity.

How long does it take?

As a general guide:

  • Single storey extension: 10 to 16 weeks
  • Double storey extension: 16 to 24 weeks or more
  • Garage conversion: 4 to 8 weeks
  • Side return extension: 8 to 14 weeks
  • Larger wraparound extension: 14 to 22 weeks or more

These are approximate construction periods from starting on site to handover, and depend on the complexity and specification of the job.

From enquiry to start date

After an initial enquiry, we aim to arrange a site visit quickly. Once we have drawings or a specification and have visited the property, we generally aim to provide a detailed quotation within 7 to 14 days. Start dates depend on our live programme and the size of the project, and we agree a realistic commencement date with you before anything is finalised.

How payment works

Larger projects are normally paid through an agreed stage payment schedule, linked to progress on site, rather than the full amount upfront. The exact structure is agreed before work starts, so both sides know when each payment is due.

A recent Bedfordshire project

We recently completed a knock-through and kitchen extension in Westoning, creating a more open plan living and kitchen space alongside the extension work.

Get an accurate quote for your project

These figures are indicative guide ranges, not fixed quotations. Every property, design, ground condition and specification is different, so we always visit the property and provide a full written quotation before any contract is agreed. Get in touch for a free site visit and an accurate quote for your project.